I-66 Eastbound Widening Inside the Beltway

Description:
Construction of an additional through lane along approximately four miles of eastbound I-66 between the Dulles Connector Road (Route 267) in Fairfax County and Fairfax Drive (Route 237) in the Ballston area of Arlington County, Virginia. The project also involved ramp modifications at Exit 69 and Exit 71, bridge rehabilitation and/or repairs, widening of several bridges, constructing a new grade-separated crossing of the Washington & Old Dominion (“W&OD”) Trail at Lee Highway (Route 29), replacing and/or constructing new sound barriers, park and trail modifications, landscaping, stormwater management and drainage improvements, and new signage and lighting.

Location: Arlington, Virginia
Owner: Virginia Department of Transportation (VDOT)
Duration: 2018 to 2021
Estimated Construction Budget: 85 million